* The Haryana Power Purchase Centre (HPPC) has issued a tender for the project.* The bid-submission deadline is January 28, 2019.* An upper tariff ceiling of Rs.3 (~$0.043)/kWh has been set for this tender.* It has mandated that the capacity will be developed under two categories. Under Category I, 240 MW of cumulative capacity will be developed with a minimum capacity of 3 MW and a maximum of 240 MW.* Under Category II, 60 MW of cumulative capacity will be developed with a minimum...