The company intends to apply for financing from the World Bank towards the cost of the proposed commuter corridor & intended to apply part of the proceeds for consulting services. (I) The detailed engineering involves a) Carrying out final location survey b) Geo-technical investigation c) preparing GADs for bridges, buildings, ESPs of yards, land plans, utility survey, preparing detailed estimate & BOQ d) Planning for signaling and telecommunication works e) Planning for electrification and general electrical work and other allied works and (II) Detailed Design Engineering for all bridges and structures to be constructed for the project including PMC for designs during execution of the project. Consultant will be selected in accordance with the QCBS method set out in the World Bank's Procurement Regulation for IPF Borrowers, July 2016 issued by World Bank. Document sale ends on 27th October, 2016. The last date for submission is 28th October, 2016.The estimated cost of the project is obtained as per June 2011.